Case Studies

GENGRAS needed a reliable, cost-effective way to reduce HVAC energy costs across complex building systems while improving operational control. Rather than move forward with the HVAC manufacturer’s OEM solution, Gengras selected SES based on the successful performance of the DLC system at a nearby Chrysler, Dodge, and Jeep dealership
EPIC, like many multisite franchise operators, was facing rising energy costs, inconsistent HVAC asset performance, and limited visibility into energy usage across locations. With equipment often running after hours, systems working against each other, and waste going undetected, energy costs climbed while asset lifecycles shortened and capital planning became more difficult.
With Save Energy Systems’ DLC technology, Planet Fitness saves money, helps the environment, and keeps club air fresh.
The Sheraton Stamford Hotel is a 389 room, full-service hotel with over 18,000 square feet meeting space. There are eighteen water sourced heat pumps ranging in size from 10 to 30 tons that provide heating and cooling to the common areas and conference rooms.